Ragewire NTT Global Data Center

Ragewire NTT Global Data Center

UES provided geotechnical, environmental and construction materials testing services for this 76.3-acre property located at E. Elliot Road and S. Signal Butte Road. This data Center will be developed in phases and Phase 1 is a 100,000 square foot building. At full build, the facility will deliver a total of 240,000kW critical load for customer use.

CLIENT

LOCATION

Mesa, Arizona

SERVICES PROVIDED

Materials Testing

Geotechnical Engineering

Environmental Consulting

CyrusOne Building 4

CyrusOne, Building 4

Phase 1 of CyrusOne’s Building 4 consists of 120,000 square feet and will provide 9 megawatts of generator power with 80,000 square feet of data center space. Building 4 is one of seven buildings that will make up the 1,000,000 square feet master planned facility in Chandler, Arizona.

When finished, the campus will deliver up to 100 megawatts of power to serve enterprises in the Western U.S., making it one of the largest and most energy efficient data centers in the country.

UES provided construction materials testing services for this project along with buildings 1,2,3,7, and 8. The total project includes 13 buildings in Phase 1 totaling 5.5 million square feet.

CLIENT

LOCATION

Chandler, Arizona

SERVICES PROVIDED

Materials Testing

Field & Code Compliance

Stream Data Centers

Stream Data Centers

Stream’s Phoenix campus includes the first of five planned facilities, beginning with a 418,200 square foot hyperscale data center on 157 acres of land. The phase 1 facility will support 40+ MW of critical load, now available with an internal 4.5 MW of capacity. At full build, the entire campus will support up to 2 million square feet of data center facilities and 200 MW of critical load.

CLIENT

LOCATION

Goodyear, Arizona

SERVICES PROVIDED

Materials Testing

Geotechnical Engineering

Environmental Consulting

SLC Global Logistics Center, Building 7

SLC Global Logistics Center, Building 7

UES provided special inspections for the site development and construction of a 202,500 square foot concrete tilt-up building built on conventional foundations of continuous footings and isolated footings, with slab on grade.

Building 7 is just one structure in the 3,000-acre manufacturing, distribution, and logistics development which will include 13 buildings in Phase 1 totaling 5.5 million square feet.

CLIENT

LOCATION

Salt Lake City, Utah

SERVICES PROVIDED

Field & Code Compliance

Hyundai Motor Group Vehicle Battery Plant

Hyundai Motor Group Vehicle Battery Plant

In one of the largest economic development projects in Georgia’s history, Hyundai Motor Group and SK On (a lithium-ion battery producer) is beginning to build an electric vehicle battery manufacturing facility in Kingston, GA, (northwest of Atlanta) set to open in 2025.

The 600-acre site requires an approximate total of 10.2 million cubic yards of material (soil, rip rock, blast rock) to be moved during this project with an aggressive schedule of approximately 10 months for earthwork.

Contour, a UES company, is providing soil testing and earthwork observation, rock verification and quantification of rock discovered during mass grading, settlement monitoring, and NPDES (National Pollutant Discharge Elimination System) monitoring.

CLIENT

LOCATION

Kingston, GA

SERVICES PROVIDED

Materials Testing

Environmental Consulting