Edgecore Mesa Data Center

Edgecore Mesa Data Center

This 1.25 million square foot campus located in Mesa, Arizona includes seven data halls, staging and storage areas adjacent to loading docks, and secure site entry. The first of the seven data halls is complete and totals 178,252 sq ft with an adjoining 20,000 sq ft of office and associated space.

The two-story building, located on the southwest corner of the campus closest to the main entrance, has 32 MW of critical load capacity. This project is LEED certified Silver.

CLIENT

LOCATION

Mesa, Arizona

SERVICES PROVIDED

Materials Testing

Geotechnical Engineering

Environmental Consulting

Copper Mountain Solar 5

Copper Mountain Solar 5

Copper Mountain Solar 5 is a 315 MW AC Solar project with a substation and transmission line. UES provided third-party materials testing and inspections as required for the owner to obtain a permit from the City of Boulder City. On-site improvements included field density testing and observations during utility backfill operations and access road subgrade. 

The UES structural services included reinforced concrete inspection, drilled pier foundations, driven pile foundations, structural steel inspection, epoxy, and mechanical anchor inspection.

CLIENT

Sempre Generation

LOCATION

Boulder City, Nevada

SERVICES PROVIDED

Materials Testing

Field & Code Compliance

Geotechnical Engineering

Iron Mountain Data Center

Iron Mountain Data Center

The 48-megawatt, 550,000 square foot data center will double the size of the Phoenix campus with a 9-acre expansion to support customer demand. A two-phase development plan is underway, with an initial delivery of 24 megawatts.

UES provided construction materials testing services for this data center.

CLIENT

LOCATION

Phoenix, Arizona

SERVICES PROVIDED

Materials Testing

West Henderson Hospital

West Henderson Hospital

The Valley Health System and UHS of Delaware is constructing a new hospital on a 40-acre campus. Phase I of this project involves the construction of the North tower, which will be seven stories, and the East tower, which will be five stories; both towers involve steel-frame construction, SidePlate beam to column connections, and full-pen welded column splice connections. The $385 million hospital project will include 150 beds across both towers, which will be approximately 400,000 SF. UES is currently working on Phase 1, which is tentatively scheduled to finish in mid-2024. In future phases, the hospital will grow to include 450 beds and other improvements.

UES’ scope of work includes Quality Assurance testing and inspections on grading, utility backfill, concrete, structural steel/welding, ultrasonic testing (NDT), masonry, spray-applied fireproofing, firestopping, EIFS, post-installed anchors, floor flatness, and levelness testing.

CLIENT

Valley Health System and UHS of Delaware, Inc. C/o SR Construction

LOCATION

Henderson, Nevada

SERVICES PROVIDED

Geotechnical Engineering

Field & Code Compliance

Materials Testing

Tropical Distribution Center 4

Tropical Distribution Center 4

The UES Las Vegas team provided geotechnical recommendations, construction materials testing, and special inspections for the fourth building at the 120-acre, 1.6 million SF Tropical Distribution Center in North Las Vegas. The building is a new warehouse constructed with tilt-up panels and totals 246,400 SF of Class A industrial space with
convenient access to I-15 and 215 via Tropical Parkway. The building has 36-foot clear heights with 43 dock-high doors and two grade-level doors.

The construction also included a large truck court with 51 trailer parking spaces and parking for an additional 203 automobiles. Our services included geotechnical exploration and recommendations, review of the plans for conformance with that guidance, QAA Special Inspections for grading/soils, reinforced concrete, structural steel, epoxy and mechanical anchors, wood construction, and floor flatness/levelness. The UES team also provided field density testing and observations during on- and off-site improvements such as utility backfill operations, curb, gutter, and sidewalks.

CLIENT

Van Trust Real Estate, LLC

LOCATION

Las Vegas, Nevada

SERVICES PROVIDED

Materials Testing

Field & Code Compliance

Geotechnical Engineering

Southwestern Community College Performing Arts Center

Southwestern Community College Performing Arts Center

This 72,529 SF Performing Arts Center, located adjacent the new Wellness & Aquatics Complex at Southwestern Community College, features a 500-seat theater, a 151-seat black box theater, instructional facilities, and a music/dance studio.

UES was contracted as the Geotechnical Engineer of Record, and provided compliance inspection services including soils, shop and field weld inspections, masonry inspection, and reinforced concrete inspection. Upon completion, the $59 million project achieved LEED Silver certification.

CLIENT

Southwestern Community College District

LOCATION

Chula Vista, California

SERVICES PROVIDED

Materials Testing

Field & Code Compliance

Geotechnical Engineering

Millcreek City Hall

Millcreek City Hall

UES is providing construction materials testing and inspections on the new Millcreek City Hall. This six-story concrete and glass structure will feature a basement, ground-floor market and exposition place, four city and police operations floors, a sixth-floor community center reception hall, and an outdoor climbing wall. UES’ testing and inspection services include soil inspections; concrete inspections, including strand placement; steel bolting inspections; steel welding inspections; miscellaneous steel inspections, including roof and floor deck welding; mass timber inspections; post-installed anchor inspections; non-structural component inspections, including exterior cladding and mechanical/electrical components; and review of deferred submittals.

The most significant benefit that UES provides for this project is proactive preliminary inspections. During a pre-construction meeting for post-tension, our team identified design irregularities that were addressed before the work began, saving substantial time and the potential costs associated with revised construction. Being a proactive and involved member of the project team is something we value at UES because those characteristics exemplify our core values. This standard of excellence is why our clients continue to trust UES to help complete projects.

CLIENT

The City of Millcreek

LOCATION

Millcreek, Utah

SERVICES PROVIDED

Materials Testing

Field & Code Compliance

Las Vegas Convention Center Expansion, Phase II

Las Vegas Convention Center Expansion, Phase II

The Las Vegas Convention Center Expansion – Phase II (LVCC Phase II) project was a significant expansion and renovation of the LVCC to accommodate current needs and capture future trade show opportunities. The LVCC Phase II project added 1.4 million SF to the convention center facility, including at least 600,000 SF of new, leasable exhibit space. 

The UES team provided QAA materials testing and special inspections
for the building and its components during construction to verify construction compliance with the project’s design, engineering, and required codes. UES’ scope of work included the following testing and inspections:

  • Oversight of Geotechnical recommendations
  • Structural fill, grading, soils and pad certification
  • Reinforced concrete on grade and elevated
  • Drilled pier foundations
  • Structural masonry
  • Structural steel
  • Exterior insulation finishing system
  • Fire-resistive penetrations and joints
  • Floor flatness and floor levelness
  • Epoxy and mechanical anchors
  • Spray-applied fireproofing and intumescent paint fireproofing
  • Final reports for governing jurisdictions
  • Project coordination with Owner Representative, Contractor and
    Design Team during construction

CLIENT

Las Vegas Convention and Visitor Authority

LOCATION

Las Vegas, Nevada

SERVICES PROVIDED

Materials Testing

Field & Code Compliance

Geotechnical Engineering

Ballpark Village

Ballpark Village

The 3.5-acre Ballpark Village site is located adjacent to PETCO Park and represents the largest contiguous and undeveloped land remaining in downtown San Diego. JMI Realty and Greystar constructed a 37-story apartment tower and surrounding low-rise buildings upon a three-level (1,214-space) underground parking garage. The project also includes 55,000 SF of ground-floor retail space, and a pedestrian and vehicle thoroughfare.

The $250 million dollar project was constructed between April 2015 and
August 2018. The multifamily assets offer views of the Pacific Ocean,
San Diego Bay, Coronado Island, the Coronado Bridge, Balboa Park,
Point Loma, and the downtown skyline. Ballpark Village is part of a
master-planned development in the Ballpark District and a six-building,
mixed-use project.

UES provided all geotechnical engineering and consulting services and
all laboratory materials testing services during construction. Our services
include, but were not limited to, geotechnical engineering, geotechnical
consulting, soils observation and testing, installation and testing of
hydrostatic hold-down anchors, inspection and materials testing of
concrete, mortar, grout, masonry, high-strength bolts, structural steel,
waterproofing, fireproofing, and roofing testing. CTE engineered and
constructed a large diameter drilled pier or caisson for alternative support of the southwest corner of the tower building to eliminate an additional un-constructible detached oversized below-grade mat foundation.

CLIENT

JMI Realty

LOCATION

San Diego, California

SERVICES PROVIDED

Geotechnical Engineering

Materials Testing

Field & Code Compliance

1700 Pavilion Office Building and Parking Garage

1700 Pavilion Office Building and Parking Garage

1700 Pavilion is one of the latest additions to Downtown Summerlin, a growing area with entertainment, business centers, and residential properties. This project involved the construction of a ten-story, steel-framed building with concrete stair core and slab-on-metal decks, as well as a seven-story cast-in-place concrete parking garage with post-tensioned beams, decks, and girders. For the building, UES performed grading, reinforced concrete, structural steel, fireproofing, firestopping, and post-installed anchor inspections.

UES also performed geotechnical structural observations for foundations. For the parking garage, UES performed grading, reinforced concrete, structural masonry, and structural steel special inspections, as well as geotechnical structural observations for foundations.

CLIENT

The Howard Hughes Corporation

LOCATION

Las Vegas, Nevada

SERVICES PROVIDED

Geotechnical Engineering

Materials Testing

Field & Code Compliance