Skip to content

Ballpark Village

The 3.5-acre Ballpark Village site is located adjacent to PETCO Park and represents the largest contiguous and undeveloped land remaining in downtown San Diego. JMI Realty and Greystar constructed a 37-story apartment tower and surrounding low-rise buildings upon a three-level (1,214-space) underground parking garage. The project also includes 55,000 SF of ground-floor retail space, and a pedestrian and vehicle thoroughfare.

The $250 million dollar project was constructed between April 2015 and
August 2018. The multifamily assets offer views of the Pacific Ocean,
San Diego Bay, Coronado Island, the Coronado Bridge, Balboa Park,
Point Loma, and the downtown skyline. Ballpark Village is part of a
master-planned development in the Ballpark District and a six-building,
mixed-use project.

UES provided all geotechnical engineering and consulting services and
all laboratory materials testing services during construction. Our services
include, but were not limited to, geotechnical engineering, geotechnical
consulting, soils observation and testing, installation and testing of
hydrostatic hold-down anchors, inspection and materials testing of
concrete, mortar, grout, masonry, high-strength bolts, structural steel,
waterproofing, fireproofing, and roofing testing. CTE engineered and
constructed a large diameter drilled pier or caisson for alternative support of the southwest corner of the tower building to eliminate an additional un-constructible detached oversized below-grade mat foundation.

CLIENT

JMI Realty

LOCATION

San Diego, California

SERVICES PROVIDED

Geotechnical Engineering

Materials Testing

Field & Code Compliance