Client Need
Allegiant Stadium, a $1.8 billion world-class venue and home to the Las Vegas Raiders, was designed to host major sporting and entertainment events. Given the scale and complexity of the project, the client required a geotechnical partner capable of delivering precise subsurface data and testing services to support the design and construction of deep foundations, retaining structures, floor systems, and other key infrastructure elements. Additional non-destructive testing was needed to assess legacy infrastructure already present on the site, including communication tower foundations.

How We Helped
UES was engaged to provide comprehensive geotechnical engineering and specialty testing services throughout the project lifecycle. Our team performed detailed field investigations and delivered a Geotechnical Data Report (GDR) to inform design decisions related to soil conditions, foundation systems, floor slabs, pavement, and utility corridors. We also supported the project with a range of advanced non-destructive testing (NDT) methods to verify subsurface conditions and evaluate existing structures without disruption.
Our services included:
- Geotechnical exploration and reporting
- Foundation and retaining wall design recommendations
- Earthwork and utility trench backfill analysis
- Sonic Echo/Impulse Response (SE/IR) testing for communication tower foundations
- Low-strain Pile Integrity Testing (PIT)
- Ultrasonic Pulse Velocity (UPV) testing
- Ground Penetrating Radar (GPR) scans
Project Highlights
- Stadium Capacity: ~65,000 seats
- Total Project Cost: $1.8 Billion
- Construction Completed: July 2020
- Primary Use: NFL Games, Concerts, and Large-Scale Events
- Notable Feature: Retractable natural turf field and translucent ETFE roof
Client & Community Impact
UES’s geotechnical and advanced testing expertise played a critical role in bringing Allegiant Stadium to life on time and with confidence in its structural integrity. Our contribution helped ensure the stadium’s long-term performance while supporting one of the most iconic and transformative developments in Southern Nevada’s sports and entertainment landscape.