Our Projects

  • Read More
    Eagle Shadow Mountain Solar Project
    Eagle Shadow Mountain Solar Project Eagle Shadow Mountain Solar Project was the largest solar installation to date built on tribal land and was also the largeest solar PV project ever built for NV Energy. This 300-megawatt (MW) project was built on...
  • Read More
    Mohave Sunrise Solar Phase II
    Mohave sunrise solar phase II The Mohave Sunrise Solar Phase II project sits on the northern third, about 80 acres of a single parcel totaling approximately 220 acres developed with a photovoltaic electric generation facility. UES provided information and geotechnical engineering recommendations...
  • Read More
    CVG FEAM Aero Hangar
    CVG FEAM Aero Hangar The new $45 million CVG FEAM Aero Hangar at Cincinnati/Northern Kentucky International Airport (CVG) is a 150,000 square-foot building consisting of three-bays to house Boeing 767 aircrafts. During construction, UES provided materials testing and special inspection services including...
  • Read More
    Edgecore Mesa Data Center
    Edgecore Mesa Data Center This 1.25 million square foot campus located in Mesa, Arizona includes seven data halls, staging and storage areas adjacent to loading docks, and secure site entry. The first of the seven data halls is complete and totals...
  • Read More
    I-277 Pedestrian Rail Trail
    I-277 Pedestrian Rail Trail The Rail Trail Pedestrian Bridge provides a critical pedestrian crossing that will connect the Charlotte City Center to the South End neighborhood. The bridge will connect over 40 miles of bikeways into the city center, expanding...
  • Read More
    Copper Mountain Solar 5
    Copper Mountain Solar 5 Copper Mountain Solar 5 is a 315 MW AC Solar project with a substation and transmission line. UES provided third-party materials testing and inspections as required for the owner to obtain a permit from the City of...
  • Read More
    Iron Mountain Data Center
    Iron Mountain Data Center The 48-megawatt, 550,000 square foot data center will double the size of the Phoenix campus with a 9-acre expansion to support customer demand. A two-phase development plan is underway, with an initial delivery of 24 megawatts.UES provided...
  • Read More
    National Institute of Health Surgery, Radiology, and Lab Medicine Campus
    National Institute of Health Surgery, Radiology, and Lab Medicine Campus Construction broke ground in May of 2023 on this $630 million addition to the National Institute of Health (NIH) Clinical Center in Bethesda, MD. The NIH of Health Surgery, Radiology, and...
  • Read More
    AER in the District