After construction, concern existed over the as-built conditions of a hangar slab at an international airport. Upon investigation by MEA, a UES Company, it was found that neither the subbase nor subgrade met the engineering properties assumed in the design. In fact, the slab thickness was locally below the minimum specified. The specified hangar slab system is provided in Figure 1.


When modeling the HWD deflection characteristics of the slab and the range of combined reaction modulus conditions, it was found that the slab had sufficient capacity, thus avoiding very significant rehabilitation costs. Now, after several years in operation, the slab has performed well, validating the conclusion reached by MEA.
On this project, a complex web of contract specifications resulted from various input from civil, structural, geotechnical, and architectural engineering firms. Although a detailed and careful analysis would have unraveled these confusing contract specifications, they resulted in the misapplication of the intended specifications was exacerbated by the use of a different company for slab construction, rather than the geotechnical designer. To further complicate the matter, the geotechnical designer provided recommendations when it was virtually impossible to achieve the intended as-built conditions given the subgrade soils.
Laboratory testing had shown that the specified soil subgrade would not hold up and would swell with moisture (see Figure 3). In addition to the subgrade softening, the associated, but inconspicuous, swelling also becomes problematic upon exposure to moisture as it raises the grade which in turn requires the stone and/or concrete thickness to be cut in order to meet the specified floor surface elevation.

Problems arose when it was recognized that the as-built hangar slab/soil support system was not installed as per the design. The concern was that severe slab damage would possibly result once the support system was loaded with aircrafts.
The potential soil support problems were discovered late, as the geotechnical designer was not involved in the day-to-day slab construction activities in order to ensure that the design intent was being followed. Moreover, the specifications developed were not practical for the subgrade soils present. Despite this sub-standard construction, MEA found through HWD and other testing that the as-built slab could sustain the anticipated aircraft loads.