Skip to content

Florida Structural Integrity Reserve Studies (SIRS)

Keeping Your Condo Safe and Secure

HB 913: Important Updates to Florida’s SIRS Requirements (Effective July 1st, 2025)

Is your Florida condo or cooperative association in compliance with Senate Bill 4D (SB 4D) and the new House Bill 913 (HB 913)? These laws require HOAs to complete a Structural Integrity Reserve Study (SIRS) at least once every 10 years after a condominium is constructed. Florida House Bill 913 (HB 913) introduces several key adjustments to the Structural Integrity Reserve Study (SIRS) requirements, providing condominium and cooperative associations with greater clarity and flexibility. Key updates include:
  • Extended Deadline: The initial SIRS completion deadline is now December 31, 2025.
  • “Habitable Stories” Clarification: The SIRS requirement applies to buildings that are three or more habitable stories in height, providing a clearer definition of applicable structures (1st floor garage spaces not considered habitable spaces).
  • New Funding Options: Associations have more flexible ways to fund required reserves, including special assessments, lines of credit, or loans, with majority owner approval.
  • Temporary Reserve Pause: In some cases, associations can, with member approval, temporarily pause or reduce reserve contributions for up to two years to prioritize urgent repairs identified in a Milestone Inspection.
  • Raised Reserve Threshold: The minimum cost threshold for components to be mandatorily included in the SIRS has increased from $10,000 to $25,000.
  • Conflict of Interest Disclosures: Design professionals must disclose in writing if they also intend to bid on related repair or replacement work.
UES is fully knowledgeable about all HB 913 updates and is ready to assist your association in meeting these revised requirements efficiently and effectively. This applies to all buildings on the property that are three or more habitable stories in height. The initial deadline for compliance has been extended to December 31, 2025. A SIRS is a crucial assessment that helps ensure the long-term safety, structural soundness, and financial health of your building.

GET A QUOTE

To receive a quote or learn more on how UES can help you with your inspections, fill out the form below.  If you have any questions, you can also reach our team at condo@uesmilestone.com.

What is a Structural Integrity Reserve Studies (SIRS)?

A SIRS is a comprehensive evaluation of your building’s critical structural components. It identifies potential issues, estimates the remaining lifespan of these elements, and provides a roadmap for future maintenance and repairs. This information is vital for condo and cooperative associations to:

  • Comply with SB 4D: Proactively meet legal obligations and avoid fines and penalties associated with non-compliance.
  • Protect resident safety: Identify and address potential structural problems before they become serious.
  • Safeguard property investments: Maintain the value of your condo or cooperative units.
  • Plan for future expenses: Develop a clear financial plan for necessary repairs and replacements.
  • Make informed financial decisions: Allocate reserve funds effectively for building maintenance.

Why Choose UES for Your Florida SIRS?

UES is a leading provider of SIRS services in Florida. We offer unparalleled expertise and a commitment to quality:

  • Experienced & Licensed Professionals: Our team includes licensed professional engineers, threshold special inspectors, senior-level architects, and other qualified personnel specifically experienced in Florida’s building codes and SIRS requirements.
  • Turnkey Solutions: We handle everything from initial assessments to design and corrosion studies, offering a comprehensive solution.
  • Statewide Accessibility: With 18 offices across Florida, we make it easy to access our services no matter where you’re located.
  • Cost-Effective Approach: We understand the current economic climate and offer competitive rates.
  • Advanced Technology: We utilize cutting-edge software and virtual design consulting (VDC) for efficient project management.
What Does a UES SIRS Include?

Our comprehensive SIRS includes the following elements:

  • Detailed Visual Inspections: Our qualified inspectors will examine critical structural components.
  • Remaining Useful Life Assessments: We estimate the remaining lifespan of each inspected element.
  • Estimated Replacement Costs: Receive transparent estimates for potential future repairs.
  • Recommended Reserve Funding Schedule: Develop a clear plan outlining a recommended schedule for reserve contributions to help you prepare for future expenses effectively and meet statutory funding requirements.
The UES SIRS Process

Our streamlined process is designed to be efficient and informative:

  • Desktop Review: We analyze existing property documentation. We begin by understanding your specific needs, building history, and analyzing existing property documentation (e.g., previous reports, plans).
  • Optional Site Visit: A free, on-site visit can be scheduled to gather additional information.
  • Project Proposal: We propose a customized SIRS plan with a transparent cost breakdown.
  • Comprehensive Inspection: Our team conducts a thorough on-site inspection (including drone footage, if needed).
  • Report Delivery: Receive a detailed report with findings, recommendations, and a revision round included.
  • Client Consultation: Our team is available to discuss the results and answer any questions.
Schedule Your Free SIRS Consultation Today!
Don't wait until the deadline. Contact UES today for a free consultation and discuss your Florida SIRS needs. We are here to help you ensure the safety, longevity, and value of your condo or cooperative building. Fill in the Contact form to schedule your free consultation or request a quote.

Frequently Asked Questions

When do Florida condo/cooperative associations need a SIRS?
Florida’s SIRS regulations require HOAs to complete a Structural Integrity Reserve Study (SIRS) at least every 10 years following the creation of a condominium. The initial deadline for compliance is now December 31, 2025. The requirement applies to any building on the property that is three or more habitable stories in height.
What are the requirements of a Florida SIRS?
The report must identify specific components and outline their condition, remaining life, and estimated replacement costs.
How long does a SIRS take to complete?
A typical UES SIRS can be completed within 30-45 days from the site inspection, depending on the size and complexity of the property. We work diligently to provide timely reports.
What happens if an association doesn't get a SIRS?
The association may face fines, penalties, and potential legal issues.
When is a SIRS required?
A structural integrity reserve study must be completed at least every 10 years after the condominium’s creation for each building on the condominium property and before a developer turns over control of the building common areas to association unit owners.
What are the key differences between a Milestone Inspection and a SIRS?
While both are vital for Florida building safety, a Milestone Inspection primarily assesses the current structural safety and integrity of buildings 25-30+ years old. A SIRS, however, is a forward-looking financial planning tool that evaluates the condition and remaining useful life of structural components to determine adequate reserve funding for future repairs and replacements. Both are mandated by Florida law for applicable buildings.
Can UES perform both Milestone Inspections and Structural Integrity Reserve Studies?
Absolutely. UES is fully equipped and licensed to perform both Milestone Inspections and SIRS throughout Florida. We can provide a coordinated and potentially cost-effective approach if your association requires both services.